Question No 7

You are asked to cable up a VxRail G Series cluster to a redundant pair of 1/10G switches.What is the cabling best practice for this configuration?

Options

A. Cable ports 1 and 2 to oneswitch. Cable ports 3 and 4 to the other switch.
B. Cable ports 1 and 2 to one switch. Cable ports 3 and 4 to the other switch. Cable BMC from node 1 and
2 to one switch. Cable BMC from node 3 and 4 to the other switch.
C. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch.
D. Cable ports 1 and 3 to one switch. Cable ports 2 and 4 to the other switch. Cable BMC from node 1 and 3 to one switch. Cable BMC from node 2 and 4 to the other switch.

Answer: D